{"id":1931,"date":"2026-07-29T21:58:50","date_gmt":"2026-07-30T00:58:50","guid":{"rendered":"https:\/\/standrewswharf.com\/?p=1931"},"modified":"2026-07-29T21:58:50","modified_gmt":"2026-07-30T00:58:50","slug":"saint-andrews-wharf-renewal-comes-to-halt-after-council-cancels-tender","status":"publish","type":"post","link":"https:\/\/standrewswharf.com\/?p=1931","title":{"rendered":"Saint Andrews wharf renewal comes to halt after council cancels tender"},"content":{"rendered":"<h2 class=\"deck\" lang=\"en\">Lowest bid on project to revitalize treasured wharf was more than $2 million over budget<\/h2>\n<h2 class=\"deck\" lang=\"en\"><span class=\"authorText\" style=\"font-size: 16px;\" data-cy=\"author-text\"><a class=\"\" href=\"https:\/\/www.cbc.ca\/news\/canada\/new-brunswick\/author\/isabelle-leger-1.5807169\" target=\"_blank\" rel=\"noopener\">Isabelle Leger<\/a><\/span><span style=\"font-size: 16px;\">\u00a0<\/span><span class=\"bullet\" style=\"font-size: 16px;\">\u00b7\u00a0<\/span><span style=\"font-size: 16px;\">CBC News\u00a0<\/span><span class=\"bullet\" style=\"font-size: 16px;\">\u00b7\u00a0<\/span><time class=\"timeStamp\" style=\"font-size: 16px;\" datetime=\"2025-09-16T20:41:06.214Z\">Posted: Sep 16, 2025 5:41 PM ADT | Last Updated: September 16, 2025<\/time><\/h2>\n<p><a href=\"https:\/\/www.cbc.ca\/news\/canada\/new-brunswick\/saint-andrews-wharf-refurbishment-project-cancelled-tender-1.7635348\" target=\"_blank\" rel=\"noopener\">https:\/\/www.cbc.ca\/news\/canada\/new-brunswick\/saint-andrews-wharf-refurbishment-project-cancelled-tender-1.7635348<\/a><\/p>\n<div data-cy=\"storyWrapper\">\n<figure class=\"imageMedia-IspZw imageMedia leadmedia-story full\">\n<div class=\"placeholder-cWBmZ placeholder\"><picture><img decoding=\"async\" src=\"https:\/\/i.cbc.ca\/ais\/1.7562135,1753899101000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%2871%2C47%2C1836%2C1032%29%3B\" sizes=\"(max-width: 762px) 100vw,(max-width: 960px) 762px,730px\" srcset=\"https:\/\/i.cbc.ca\/ais\/1.7562135,1753899101000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%2871%2C47%2C1836%2C1032%29%3BResize%3D860 860w,https:\/\/i.cbc.ca\/ais\/1.7562135,1753899101000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%2871%2C47%2C1836%2C1032%29%3BResize%3D1179 1179w,https:\/\/i.cbc.ca\/ais\/1.7562135,1753899101000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%2871%2C47%2C1836%2C1032%29%3BResize%3D1280 1280w\" alt=\"A wharf stretches out to the sea.\" data-cy=\"leadmedia-story-img\" \/><\/picture><\/div><figcaption class=\"image-caption\">The Market Wharf, a landmark of Saint Andrews, reaches out to the Passamaquoddy Bay. (Michael Heenan\/CBC)<\/figcaption><\/figure>\n<div class=\"story\">\n<p dir=\"ltr\">The controversial refurbishment\u00a0of a wharf in Saint Andrews will not go ahead as planned, after council voted to cancel the tender for the project.<\/p>\n<p dir=\"ltr\">The decision came after all bids on the\u00a0project\u00a0were millions of dollars over the town&#8217;s budget.<\/p>\n<p dir=\"ltr\">&#8220;Due to all of the associated costs and construction costs, it brought it up way over budget from what we could approve,&#8221; said Kate Akagi, the acting Saint Andrews mayor.<\/p>\n<div class=\"adContainer-F11hw in-read-double-NumGh\">\n<div class=\"ad-in-read-double ad-detail \" data-cy=\"in-read-double\" data-testid=\"ads-in-read-double\">\n<div id=\"in-read-double-900808\" class=\"advertisement in-read-double\">&#8220;We could do it, but that leaves our town strapped and we didn&#8217;t want to do that.&#8221;<\/div>\n<\/div>\n<\/div>\n<p dir=\"ltr\">The project would have seen Market Wharf, which is long overdue for repairs, infilled with rock and steel.<\/p>\n<ul class=\"similarLinksContainer\" dir=\"ltr\">\n<li class=\"similarLinkItem-j9sEK\">\n<div class=\"card-SmBL5\">\n<p class=\"title-cSJax noPaddingCardTitle\">Saint Andrews property owners speak out against wharf refurbishment plan<\/p>\n<\/div>\n<\/li>\n<li class=\"similarLinkItem-j9sEK\">\n<div class=\"card-SmBL5\">\n<p class=\"title-cSJax noPaddingCardTitle\">Saint Andrews town council votes for Market Wharf refurbishment despite public pushback<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<p dir=\"ltr\">The town received $5.4 million in federal and provincial funding for the refurbishment and planned to cover the remaining cost of what it estimated would be a $7 million project.<\/p>\n<p dir=\"ltr\">The tender closed on Sept. 10 with these six bids:<\/p>\n<ul>\n<li dir=\"ltr\">\n<p dir=\"ltr\">Caldwell and Ross Ltd. for $9.4 million<\/p>\n<\/li>\n<li dir=\"ltr\">\n<p dir=\"ltr\">Dexter Construction Company for $12.1 million<\/p>\n<\/li>\n<li dir=\"ltr\">\n<p dir=\"ltr\">Graystone Infrastructure Inc. for $12.2 million<\/p>\n<\/li>\n<li dir=\"ltr\">\n<p dir=\"ltr\">Fundy Contractors Ltd. for $13.4 million<\/p>\n<\/li>\n<li dir=\"ltr\">\n<p dir=\"ltr\">Greenfield Construction for $13.5 million<\/p>\n<\/li>\n<li dir=\"ltr\">\n<p dir=\"ltr\">Valley Structures Ltd. for $17 million<\/p>\n<\/li>\n<\/ul>\n<p dir=\"ltr\">Akagi said the town will now look to have another assessment of wharf conditions done by the end of the year. She said the last assessment was done about five years ago.<\/p>\n<p dir=\"ltr\">She said the town will also need to seek more funding from the government, and &#8220;we have to ask for a change of scope for funding as it&#8217;s different from\u00a0what we put in for.&#8221;<\/p>\n<p dir=\"ltr\">Akagi said she hopes to see the community become more involved with ideas about the refurbishment project, &#8220;since they didn&#8217;t like what was done.&#8221;<\/p>\n<p dir=\"ltr\">Cindy Kohler, who lives a few coastal properties away from the wharf,\u00a0was one of many residents who expressed concerns that the project could cause erosion and sediment damage along the shoreline and would take away from the historic charm of the area and original wooden wharf.<\/p>\n<div dir=\"ltr\">&#8220;I was very happy and I was very hopeful because I saw the community coming together for something they believed in,&#8221; Kohler said of her reaction to Monday evening&#8217;s council vote.<\/div>\n<p dir=\"ltr\">She said she felt the need to &#8220;get loud&#8221; when this project was brought to council in May, because she had previously experienced the repercussions of another infill project.<\/p>\n<div class=\"adContainer-F11hw in-read-SPN_4\">\n<div class=\"ad-in-read ad-detail \" data-cy=\"in-read\" data-testid=\"ads-in-read\">\n<div id=\"in-read-180678\" class=\"advertisement in-read\">Kohler said a business that had burned down near her Water Street property was infilled during the rebuilding, which created a cove between her and her neighbours&#8217; properties.<\/div>\n<\/div>\n<\/div>\n<p dir=\"ltr\">&#8220;There&#8217;s more pushback of water coming through than ever before, a lot of debris getting settled there, seaweed stays on the rocks there, and it just looks very messy,&#8221; she said.<\/p>\n<p dir=\"ltr\">Kohler said no environmental impact assessment was done for the project, so it was difficult to understand the scope of damage, if any, it would cause.<\/p>\n<p dir=\"ltr\">She hopes to see a committee of community members come together to help decide how this refurbishment will move ahead.<\/p>\n<div dir=\"ltr\">\n<figure class=\"imageMedia-IspZw imageMedia image full\">\n<div class=\"placeholder-cWBmZ placeholder\"><picture><source srcset=\"https:\/\/i.cbc.ca\/ais\/1.7562118,1758294768000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%280%2C34%2C1920%2C1046%29%3BResize%3D796\" media=\"(max-width: 480px)\" \/><img decoding=\"async\" src=\"https:\/\/i.cbc.ca\/ais\/1.7562118,1758294768000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%280%2C34%2C1920%2C1046%29%3B\" sizes=\"(max-width: 762px) calc(100vw - 32px),730px\" srcset=\"https:\/\/i.cbc.ca\/ais\/1.7562118,1758294768000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%280%2C34%2C1920%2C1046%29%3BResize%3D796 796w,https:\/\/i.cbc.ca\/ais\/1.7562118,1758294768000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%280%2C34%2C1920%2C1046%29%3BResize%3D1083 1083w,https:\/\/i.cbc.ca\/ais\/1.7562118,1758294768000\/full\/max\/0\/default.jpg?im=Crop%2Crect%3D%280%2C34%2C1920%2C1046%29%3BResize%3D1280 1280w\" alt=\"A man stands in front of a wharf.\" data-cy=\"image-img\" \/><\/picture><\/div><figcaption class=\"image-caption\">Matt Abbott, Fundy baykeeper for the Climate Council of New Brunswick, says council&#8217;s decision opens way to creating a vision for the wharf and Market Square area.\u00a0(Mike Heenan \/ CBC News)<\/figcaption><\/figure>\n<\/div>\n<p dir=\"ltr\">Matt Abbott,\u00a0Fundy baykeeper with\u00a0the Conservation Council of New Brunswick, said he wasn&#8217;t surprised to this project fell through because the cost of infrastructure\u00a0has changed significantly since the project was proposed seven years ago.<\/p>\n<p dir=\"ltr\">&#8220;With a decision like this, you have to be prudent, and I think they made a wise decision in that regard,&#8221; Abbott said.<\/p>\n<p dir=\"ltr\">He said this decision was also a testament to how &#8220;tricky&#8221; these kinds of projects can be.<\/p>\n<p dir=\"ltr\">Abbott hopes the approach now will be to figure out\u00a0a vision for what the community needs and wants from the Market Square and wharf\u00a0area and then make necessary efforts to ensure limited harm to nearby properties and the environment.<\/p>\n<\/div>\n<\/div>\n<div class=\"authorprofile\">\n<h2 class=\"title-OK_Y2\">ABOUT THE AUTHOR<\/h2>\n<div class=\"authorprofile-container\">\n<div class=\"authorprofile-name-container\"><a class=\"\" href=\"https:\/\/www.cbc.ca\/news\/canada\/new-brunswick\/author\/isabelle-leger-1.5807169\" target=\"_blank\" rel=\"noopener\">Isabelle Leger<\/a><\/p>\n<p class=\"authorprofile-title\">Isabelle Leger is a reporter based in Fredericton. You can reach her at isabelle.leger@cbc.ca<\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"Lowest bid on project to revitalize treasured wharf was more than $2 million over budget Isabelle Leger\u00a0\u00b7\u00a0CBC News\u00a0\u00b7\u00a0Posted: Sep 16, 2025 5:41 PM ADT | Last Updated: September 16, 2025 https:\/\/www.cbc.ca\/news\/canada\/new-brunswick\/saint-andrews-wharf-refurbishment-project-cancelled-tender-1.7635348 The Market Wharf, a landmark of Saint Andrews, reaches out to the Passamaquoddy Bay. (Michael Heenan\/CBC) The controversial refurbishment\u00a0of a wharf in Saint Andrews ","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"iawp_total_views":1,"footnotes":""},"categories":[30],"tags":[],"class_list":["post-1931","post","type-post","status-publish","format-standard","hentry","category-newsstories"],"_links":{"self":[{"href":"https:\/\/standrewswharf.com\/index.php?rest_route=\/wp\/v2\/posts\/1931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/standrewswharf.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/standrewswharf.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/standrewswharf.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/standrewswharf.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1931"}],"version-history":[{"count":1,"href":"https:\/\/standrewswharf.com\/index.php?rest_route=\/wp\/v2\/posts\/1931\/revisions"}],"predecessor-version":[{"id":1932,"href":"https:\/\/standrewswharf.com\/index.php?rest_route=\/wp\/v2\/posts\/1931\/revisions\/1932"}],"wp:attachment":[{"href":"https:\/\/standrewswharf.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/standrewswharf.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1931"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/standrewswharf.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}